NVision’s engineering services are helping managers of coal-fired power plants converting to natural gas to determine more quickly where to install updated instrumentation necessary to retrofit turbines to accommodate the new power source.
ADVERTISEMENT |
“By measuring the equipment via laser scanning, then creating precise 3D models of the turbine assemblies for engineers to analyze for optimal installation points, we can significantly expedite the plants’ transitions,” says Steve Kersen, president of NVision. “This can result in huge cost savings for projects that would otherwise have been budgeted for a lengthier period using less sophisticated measurement methods. In one recent project, a Southeast power plant converting to a combined-cycle gas turbine (CCGT*) system will increase wattage output by more than 30 percent and save more than $250,000 by using our services.”
…